News

  • 0
  • 0

Construction steps of foam concrete

If you are looking for high-quality products, please feel free to contact us and send an inquiry, email: brad@ihpa.net



Us President Joe Biden will start a trip to the Middle East. Biden is scheduled to visit Israel, the West Bank and Saudi Arabia from July 13 to 16.

Analysts believe that Biden's trip to the Middle East has three considerations. First of all, efforts should be made to persuade Gulf oil-producing countries to increase oil concrete foaming agent are still very uncertain.

Preparation

1. To ensure that all kinds of instruments used during construction can operate normally, check their status and break the work, and the materials must be in place.

 

2. The place where the building needs to be poured with fresh foam concrete must be clean and tidy, there is no loosening, and there is no peeling. Check and clean up the dirt on the surface in advance, remove excess stagnant water in time, carefully check the preparation of each step, and confirm that it is qualified.

 

3. To ensure the integrity of the machine in the process of transmission, we must make sure that there is enough water.

 

Construction

1. To start the machine, the constructors shall first operate the machine and debug the machine before the formal start of construction, in which it is necessary to carefully check whether there are loopholes and make sure that there are no problems before officially starting the construction.

 

2. Adjust the concentration of foamed concrete, the general density is about 300-1800kg/m3, and the foamed concrete with 300-1200kg/m3 is the most commonly used. When high concentration of foam concrete is needed, the concentration of cement slurry can be appropriately increased to control the bubble size, on the contrary, the concentration of cement slurry can be appropriately reduced. Can first add the foaming agent to the water, the general water is between 1.6 and 10kg, and the foaming agent is between 0.1 and 0.6kg, and then make it mix evenly, taking no more than 3 minutes. To form the crystals to be used next.

 

Then, according to the different needs of the construction team, follow the appropriate mix ratio to add water to the mixer, the amount of water is between 24 and 150kg, after that, you can continue to add an appropriate amount of cement to the container, the amount of cement is between 48 and 300kg, in which the cement grade is not less than 425, generally speaking, the ratio is about 6: 1, then fine sand and appropriate auxiliaries can be added, and finally, various ingredients can be fully mixed. The specific operation time is about 2 minutes. Add the prepared crystal to the newly prepared mixture, mix it evenly again, and wait 2 minutes.

 

3. Cover. Before covering, set up the hoarding where you need to cover, and after making sure that there are no pores, cover the surface with the adjusted foam concrete. According to the requirements of the construction team, a high line is placed on its surface, usually according to the surface of 2 meters, and then the surface is flattened (with a ruler, the length is between 3 and 5 meters), and it must be guaranteed not to destroy its shape due to shaking, so as to ensure the integrity of the finished product. The foamed concrete is separated according to the different requirements of the construction team. In the process of transportation, the passage of the pipeline should also be checked to prevent the instability caused by blockage, so as to ensure the smooth progress of the construction.

 

During this period, the pipes that hinder the transport of materials must be repaired in time to ensure that the appropriate pressure is always maintained. In order to prevent the bad phenomenon caused by pipeline vibration, the pipeline must be placed on the bearing tool in advance, such as Madden. Configure the corresponding filtering equipment and control the purity of the product to filter out sundries. And reasonably control the product density, when the operation is about to be completed, reasonable material selection, less waste.

 

4. Clean the equipment in time after finishing, and arrange the corresponding responsible personnel to take care of the nature first, and then spray water on the products regularly after 36 hours. It is best to spray water 2-3 times a day, and no one should be near it before. Do not use until more than 15 days after use. After completion, to carry out quality inspection and protection of the product, according to the need to fill supplementary loopholes, fine stones can be used.

 

Concrete Additives Supplier

TRUNNANO is a reliable foaming agents supplier with over 12-year experience in nano-building energy conservation and nanotechnology development.

If you are looking for high-quality CLC foaming agents, please feel free to contact us and send an inquiry. (sales@cabr-concrete.com)

We accept payment via Credit Card, T/T, West Union, and Paypal. TRUNNANO will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.


COVID-19 has led to many sites shutting down. What is the impact on China's foreign trade enterprises as a whole and small, medium and micro foreign trade enterprises?

. It is learned that some foreign trade enterprises have been affected by the epidemic and are facing periodic problems in concrete foaming agent operated by foreign trade enterprises will also fluctuate with the changes of the epidemic. Contact us for the latest quotation on concrete foaming agent.

Inquiry us

High Purity Germanium Sulfide GeS2 Powder CAS 12025-34-2, 99.99%

High Purity Molybdenum Boride MoB2 Powder CAS 12006-99-4, 99%

Metal Alloy 8.92g/Cm3 High Purity Polished Copper Plate

Metal Alloy 18.5g/cm3 Polished Tungsten Heavy Alloy Plate

High Purity Nano Hafnium Hf powder CAS 7440-58-6, 99%

Metal Alloy 18g/cm3 High Density Tungsten Alloy Ball

Metal Alloy High Density Tungsten Alloy Rod Grind Surface Tungsten Alloy Bar

High Purity Tungsten Silicide WSi2 Powder CAS 12039-88-2, 99%

High Purity Zirconium Nitride ZrN Powder CAS 25658-42-8, 99.5%

High Purity Titanium Sulfide TiS2 Powder CAS 2039-13-3, 99.99%

High Purity Nano Ag Silver powder cas 7440-22-4, 99%

High Purity 3D Printing Powder 15-5 Stainless Steel Powder

High Purity Calcium Nitride Ca3N2 Powder CAS 12013-82-0, 99.5%

High Purity Chromium Diboride CrB2 Powder CAS 12007-16-8, 99%

High Purity Silicon Sulfide SiS2 Powder CAS 13759-10-9, 99.99%

Supply Magnesium Granules Mg Granules 99.95%

Chromium Sulfide Cr2S3 Powder CAS 12018-22-3, 99.99%

High Purity 3D Printing 304 Stainless Steel Powder

High Purity Colloidal Silver Nano Silver Solution CAS 7440-22-4

High Purity Tungsten Boride WB2 Powder CAS 12007-09-9, 99%

Our Latest Products

High Purity Germanium Sulfide GeS2 Powder CAS 12025-34-2, 99.99%

Germanium Sulfide (GeS2) is a semiconductor compound with the chemical Formula GeS2. It is easily soluble when heated alkali is used, but not in water.Particle size : 100mesh Purity: 99.99% About Germanium Sulfide (GeS2) Powder: Germanium Sulfid…

High Purity Molybdenum Boride MoB2 Powder CAS 12006-99-4, 99%

Molybdenum powder boride is a combination of molybdenum with boron. The chemical formula for molybdenum is MoB2, and the molecular weight is 202.69. Purity: >99%Particle size : 5-10um Molybdenum Boride MoB2 Pulp : Molybdenum-boride consists of moly…

Metal Alloy 8.92g/Cm3 High Purity Polished Copper Plate

Copper products exhibit good electrical conductivity as well as thermal conductivity. They are also ductile, resistant to corrosion, and have a high wear resistance. They are widely used by the electricity, electronics and energy industries. Metal…